Project Plan
A survey will be carried out using a land scanning machines
about the underground structures
Depth of the cannel will be decided according to underground
structures and step by stem (block by block the work will be completed
Concrete slabs will be design and molded in a differen area
and will be brought to the site.
Detailed design will be done in Auto Cad
Required water pumps and piping requirement will be ordered
as required
Recycling plant will be installed at the sea side considering the access water disposal
particulary during rainy or flooding season.