Project Plan

A survey will be carried out using a land scanning machines about the underground structures

Depth of the cannel will be decided according to underground structures and step by stem (block by block the work will be completed

Concrete slabs will be design and molded in a differen area and will be brought to the site.

Detailed design will be done in Auto Cad

Required water pumps and piping requirement will be ordered as required

Recycling plant will be installed at the sea side  considering the access water disposal particulary during rainy or flooding season.